Washington Avenue, Brooklyn-Cycle 9th FISP inspection.
Washington Avenue-Cycle 9th FISP inspection and report filing. M+S conducted the FISP inspections to determine the need for envelope repairs. The list of necessary repairs was discussed with our clients so they can be scheduled based on their budget and timeline. M+S is working on the necessary documents to obtain NYC LPC and DOB approvals.